PROJECT PRICING GUIDE
Pricing varies immensely on a project-by-project basis depending on your needs, materials and design goals.
Take a look at the pricing guide below to gain a better idea of what range to expect on your project. These are just estimates to help prepare you before our first meeting.
KITCHEN ESTIMATE
KITCHEN ESTIMATE
BASIC
60K+
-
BASIC FINISHES, PULL & REPLACE
-
Use Existing Cabinetry Layout
-
Existing Flooring To Remain
-
No Incremental Electrical Fixtures
-
Appliances Remain In Existing Locations
-
Stock Cabinetry
-
Level 1 Countertops (Granite/Quartz)
-
Level 1 Plumbing Fixtures
-
Ceramic Tile Backsplash
MID-LEVEL
80K+
-
MID-LEVEL FINISHES, SMALL CHANGES TO SPACE
-
Cabinetry Layout Modifications Allowed Within Existing Space
-
Refinish Existing Hardwood Floors
-
Minor Electrical Changes, Add Venthood
-
Appliances May Move To Other Locations
-
Semi-Custom Cabinetry
-
Level 2 Countertops (Granite/Quartz)
-
Level 2 Plumbing Fixtures
-
Ceramic Tile Backsplash
HIGH END
110K+
-
HIGH-END FINISHES, SIGNIFICANT CHANGES TO SPACE
-
Remove Existing Walls To Accommodate Expanded Kitchen Design
-
New Flooring In Kitchen
-
Entirely New Electrical Layout
-
Appliances May Move To Other Locations
-
Custom Cabinetry
-
Exotic Granite or Quartz Countertops
-
Level 3 Plumbing Fixtures
-
Natural Stone Backsplash
BATHROOM ESTIMATE
HALL/GUEST
20K+
-
Replace Existing Tub With Fiberglass Tub
-
Keep Existing Sizes & Locations
-
Porcelain Tile Floor & Shower Walls
-
Level 1 Plumbing Fixtures
-
Pre-fabricated vanity
-
Electrical Fixtures Updated
-
Fixtures Remain In The Same Location
-
Framed Shower Door
MASTER (MID-LEVEL)
30K+
-
Replace Existing Tub & Shower, New Tile Shower
-
Expanded Shower Size, No Tub
-
Porcelain Tile Floor, Shower Floor & Shower Walls
-
Level 2 Plumbing Fixtures
-
Semi-Custom Vanity
-
Granite/Quartz Countertops
-
Electrical Fixtures Updated
-
Limited Fixture Movement
-
Semi-Frameless Shower Door
MASTER (HIGH END)
45K+
-
Replace Existing Tub & Shower with New Tile Shower & Freestanding Tub
-
Expanded Shower Size
-
Natural Stone Floor, Shower Floor & Shower Walls
-
Level 3 Plumbing Fixtures
-
Custom Vanity
-
Granite/Quartz countertops
-
Electrical Fixtures Updated
-
Fixtures May Be Moved
-
Frameless Shower Door
GENERAL REMODELING
NEW CONSTRUCTION/
ADDITIONS
140K-375K+
BASEMENTS/ATTICS
80K-185K+
DECKS/PORCHES
60K-135K+